Status
Tevatron preparing for a dry squeeze, and a proton only store. Shot setup
will immediately follow.
Plan
Terminate at 0800 1/18. E811 run begins immediately after.
E853 can use the last 3 hours of this next store as per
its "invisibility" agreement.
E811 run is planned to begin on the day shift on 1/18, and last
up to 1/23.
Nominal store length guideline is roughly 20 hours at present.
Pbar Flying Wires may be flown during the pbar shots.
If a store is lost, we will reshoot if the stack > 60e10.